60 Hz Frequency
150°C Temperature Rise
220°C Insulation Class
Primary Adjustment Taps 1 above, 1 below in 5% increments
Electrostatically Shielded
High Efficiency Aluminum Windings
Vacuum pressure Impregnated Windings
DOE Exempt
Wall Mountable up to 75kVA
Lugs included up to 75 kVA
Transformer may appear different than pictured.
Shipping Availability
High to Low Voltage extends shipping services for webstore orders to the lower 48 United States. For orders requiring shipping outside of this region, please contact us for assistance.
Shipping Charges
Shipping rates for our products may vary but generally amount to approximately 10% of the total order purchase price.
Shipping Methods
For transformers weighing below 2,500 pounds, we rely on standard LTL Carriers to ensure reliable shipping. Transformers weighing above 2,500 pounds are shipped using dedicated carriers, ensuring both timely delivery and equipment safety.
Standard Shipment Times
Under normal circumstances, our standard shipment times typically fall within the range of 3-5 business days.
Average Handling Time
The handling time for your webstore order may last up to a week, although our orders are often processed much faster. If you require expedited delivery, please reach out to us for further assistance.
Average Shipping Time
Transformers shipped from our stock generally arrive within 3-5 business days. Please note that delivery times may be extended for other units. Rest assured, High to Low Voltage operates fulfillment centers across the United States, ensuring that delivery is always imminent.